From: route@monster.com
Sent: Saturday, April 16, 2016 2:05 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Michael Pietrantoni 577 S Meadows Drive Chandler, Arizona 85224 480-225-3630 michaelpietrantoni@gmail.com Objective To find a management position that utilizes
and challenges my years of telecommunications experience and offers the
opportunity to learn new things in the industry. Education 2013 – Nokia
Siemens Networks Flexi 2G/3G/LTE Commission & Integration Certifified 2012 – Nokia
Siemens Networks Flexi LTE Installation Certification 2002 – Stratex
Networks Spectrum Digital Microwave Radio Certified 2002 – Paragon
Networks LINKmaster Training Certificate 1995 – United
States Army Signal Center, Fort Gordon, Georgia Multi-Channel
Transmission Systems O&M 1994 – Mesa
Community College, Mesa, Arizona PROFESSIONAL EXPERIENCE AT&T Wireless – Phoenix, AZ January 2014 – Present DSW LTE/UMTS MOD Construction Manager · Ensure timely installation of 4G equipment on tower and in
ground cabinets or shelters. · Supervised General Contractor tower crews performing 4G
equipment installation. · Perform Preconstruction Walks to identify potential design
issues. · Proficient in AT&T NORAD, Siterra, Filenet, Orders of
Magnitude. · Performed Quality Assessments/Punch Walks on completed
sites. · Worked closely with GC’s and Engineering to resolve
installation issues. · Managed construction activities on 250+ sites, with a
budget of $50M. Parsons – Phoenix, AZ October 2012 – Present T-Mobile Construction Manager · Ensure timely installation of 4G equipment on tower and in
ground cabinets or shelters. · Supervised General Contractor tower crews performing 4G
equipment installation. · Provided field support to GC and field personnel. · Provided daily reports to management to assist in
scheduling commissioning/integration. · Performed Quality Assessments on completed sites. · Worked closely with GC’s and Engineering to resolve
installation issues. · Performed bid walks, created SOWs/BOMs, arranged site
access, and equipment installation. Wallen Communications – Phoenix, AZ September 2011 – October 2012 Tower Technician / Tower Climber · Climb towers to help perform maintenance and installations
on the tower mounted equipment. · Involved with the demolition of old towers and the
installation of new ones. · Performed RF testing of antenna systems using Anritsu
sweep and PIM equipment. · Installed upgrades and repairs to cellular antenna systems
on towers and rooftops. · Assisted in the construction of new cell sites working
closely with engineers and interpreting drawings. · Performed AC/DC power audits. Wireless Facilities Inc. – Phoenix, AZ June 2005 – September 2011 Installation &
Maintenance Supervisor/I&M Tech. III · Installed, operated, and maintained the E911 system for
AT&T Wireless in Arizona. · Performed installation of Andrew Geometrix WLS and True
Position LMU equipment and all cabling and GPS antennas to Nokia Ultrasite
equipment, as well as DAS installations. · Conducted surveys for SCOUT applications. · Verified E911 operation with call testing to local PSAP.
· Also have experience in DTC (drive test client) and data
collections in the field. · Also proficient in the installation and programming of
Tellabs 8605 equipment. · Supervised a team of 6 people. Cox Communications – Chandler, AZ March 2004 – July 2005 Field Operations Technician I · Installed residential cable television service. · Worked with Electrical devices, tools, and tested
measurements with Tek 151, TVR 90. Cingular Wireless – Bay Area, CA March 2001 – September 2002 BTS/BSC Technician III · Integrated and maintained over 60 Cell Sites within the
wireless network area. · Performed routine modifications and preventative
maintenance with Ericsson RBS Hardware and OMT software. · Daily monitoring and maintenance of TDMA and GSM BTS
Sites. · Troubleshooting of cell sites and T1’s using T-Berd test
equipment and Anritsu SiteMaster. · Performed radio adds and cell reconfigurations. Ericsson – San Jose, CA April 1999 – July 2001 Central Office Installer II LG2 · Installed network equipment on Alcatel Lucent, Newbridge,
and Cisco Systems. · Proficient in wire wrapping, and cable lacing. · Installed Ericsson Wireless power and switching equipment
in accordance with Ericsson and Bell Standards TP76300. · Performed power terminations utilizing manual and powered
crimpers, signal terminations with a wire wrap gun and punchdown. United States Army
– Camp Casey, Korea June 1995 –
November 1999 Line-of-Site
Supervisor/Senior Operator · Performed radio communication exercises while maintaining
team safety. · Supervised line-of-site shelter support for small
extension nodes. · Provided secure communications with COMSEC (communications
security) equipment. · Conducted training on UHF, SHF, and FM radio systems. · Operated 5/10 KW power generators and vehicles up to 2 1/2
tons. · Responsible for shelter equipment and personnel.
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|